In the period 2014 - 2019, Cordeel built and renovated the Sint-Jozefkliniek in Bornem. Between the existing Block D and the new Block E, a steel connecting bridge was installed by -metal which was clad with white architectural facade panels. An extensive study was carried out to install the bridge and the planning was also of a complex nature. This was due in part to the large span, tree-shaped concrete columns and minimal space between the buildings.
The technical floor was also constructed entirely in a steel structure.

C-metal Bridge between buildings
Steel connecting bridge in Bornem
Between 2014 and 2017, Cordeel built and renovated the Sint-Jozefkliniek in Bornem. Between the existing Block D and the new Block E, C-metal installed a steel connecting bridge that was clad with white architectural facade panels. An extensive study was carried out to install the bridge and the planning was also of a complex nature. Among other things, this was because of the large span, the tree-shaped concrete columns and the minimal space between the buildings. The technical floor was also constructed entirely as a steel structure. (> 250 tons of steel)
(> 250 Tons of steel)